

Information by email only. For any question, including existing orders, please contact our customer support team by email at: contact@wellandtrees.com
If you are unable to reach us, please send us an email so that we can get back to you.
🪑 Collective seating: The well is designed with 12 to 16 seats, allowing beneficiaries to wait or use water comfortably.
🚰 Tap distribution: Five taps are fitted, enabling multiple families to access water simultaneously and reducing wait times.
⚡ Pumping system: Depending on the local setup, the well can be equipped with a robust manual pump or an electric pump powered by solar energy or the grid.
📏 Capacity and depth: Drilled to access local water tables, designed to provide consistent water to a large community of up to 700 people.
⏱️ Construction timeline: Complete installation – including drilling, pump setup, taps, and seating – is finished in under three months.
👥 Expanded collective use: This model is ideal for villages, schools, and mosques, where the well is in constant use.
Site selection and preparation: The team begins by identifying a strategic location that is both accessible to the community and suitable for drilling. This step includes checking the groundwater table and soil conditions to ensure the project’s viability.
Installation of a solid concrete enclosure: A strong concrete structure is built to secure the well and form the base of the future water point. This element is essential to ensure the stability and durability of the well.
Excavation: Digging is carried out manually or mechanically until the required depth is reached. The goal is to access a reliable water table and provide sufficient flow for collective use.
Pump installation: A manual or electric pump is installed based on local resources (grid or solar energy). This system ensures a steady and practical water supply.
Connection of taps: Five taps are connected to the pump to allow multiple families to draw water simultaneously. This setup helps organise access and reduces waiting times.
Seating area construction: 12 to 16 seats are built around the well, creating a comfortable and social space suitable for gatherings and for the elderly.
Final checks and handover: Water quality is verified, finishing touches are secured, and the well is officially handed over to the beneficiaries, along with GPS coordinates and visual documentation.
Providing access to water by building a well is considered one of the most valued charitable acts in Islam, as its benefits are long-lasting and touch an entire community.
According to a hadith reported by Muslim, the Prophet Muhammad (peace and blessings be upon him) said:
“When the son of Adam dies, his deeds come to an end except for three things: ongoing charity (sadaqah jariyah), beneficial knowledge, or a righteous child who prays for him.”
A well perfectly embodies this concept of ongoing charity: as long as families continue to use this precious water, the customer continues to receive rewards, even after their passing.
💧 Accessible and reliable drinking water: In under 3 months, the well is equipped with a manual or electric pump, providing clean water for daily use.
👥 Serving up to 700 people: Designed to supply a large number of beneficiaries, this well meets the drinking water needs of an entire community.
🛠️ Infrastructure suited for collective use: Equipped with 5 taps and a robust pumping system, it can serve multiple families simultaneously, reducing waiting times.
🌱 A space for life and gathering: Integrated seating promotes comfort, social interaction, and creates a community gathering spot around water.
🚀 Fast and durable construction: Built in under 3 months, this model ensures long-lasting service with easy maintenance for the local community.
✅ Advantages
High capacity: this model can serve up to 700 people, making it a collective solution suitable for villages and public spaces.
Convenient distribution: equipped with 5 taps, it allows multiple users to collect water at the same time, reducing waiting time.
User comfort: integrated seating areas provide a suitable space for families, elderly people, and community gatherings.
Adaptable pump: the option to install a manual or electric pump, depending on locally available resources.
Fast implementation: construction is completed in less than 3 months, with delivery ready for use.
⚠️ Disadvantages
Maintenance required: the pump and taps require regular maintenance to ensure proper operation.
Energy dependency: if an electric pump is chosen, a stable energy source (solar or grid) is required.
Higher cost: the price is higher than simpler models due to additional equipment and integrated infrastructure.
📏 Depth and capacity: adapted drilling allowing the well to serve up to 700 beneficiaries, thanks to a collective system designed for large gatherings.
🚰 Distribution through 5 taps: multiple water points operate simultaneously, improving access flow and reducing waiting time for families.
⚡ Manual or electric pump: the system is chosen based on locally available resources, ensuring installation flexibility.
🪑 Integrated facilities: seating areas are built around the well, providing comfort and practicality, especially for elderly people and rest periods.
⏱️ Construction timeline: the entire project is completed in less than 3 months, including drilling, taps and landscaping.
In general, the full project (drilling, tap installation/handover, and seating installation) is completed in under 3 months.
This model is designed to meet the needs of around 700 beneficiaries, making it a suitable solution for large villages, mosques, or schools.
Because the water point is built with 12 to 16 seats around it, so people can wait or rest in a friendly, practical place.
A classic well serves up to 500 people using a manual bucket, whereas the “well with seating” incorporates a pump (manual or electric), several taps, and a shared setup designed for larger gatherings.
Yes. The water is tested before handover to make sure it is clean and safe to drink.
Absolutely. In Islam, building a well falls under ongoing charity (sadaqah jariyah). The Prophet Muhammad (peace and blessings be upon him) said:
“When the son of Adam dies, his deeds come to an end except for three things: ongoing charity (sadaqah jariyah), beneficial knowledge, or a righteous child who prays for him.”
It depends on the local context: a sturdy manual pump may be preferred in areas without reliable power, while an electric pump (often solar-powered) is installed when possible.
The taps and the pump require regular monitoring/maintenance to ensure they function properly. Local teams are trained in this upkeep to extend the life of the installation.
Well & Trees was created by Well Solidarity, a French company, for the English-speaking market. Both brands belong to the same company and share the same teams, the same partners on the ground and the same projects.
Chat with us on WhatsApp if you have a question
Real orders, real wells. Every review comes from a verified customer.
Photos and videos arrived earlier than expected
I ordered a well in memory of my late father. The team kept me updated at every step and the photos and videos of the finished well, with his name on the sign, brought tears to my eyes. Highly recommended.
A serious company, 100% recommend
Second well with Well & Trees. Fast, responsive and professional. I received the GPS coordinates and a full video of the villagers using the pump. May Allah reward the whole team.
Sadaqah jariyah made simple
The ordering process took two minutes and the follow-up was excellent. The well was completed within the announced timeline and the children's smiles in the video say it all.
Great experience from start to finish
Clear communication, honest timeline and real proof of completion. The sign with my mother's name was exactly as requested. Will order again insha'Allah.
Moving and professional
I was a bit sceptical at first but everything was delivered as promised: confirmation, updates, then the photos, the video and the coordinates. A beautiful gift for my grandparents.
Exactly what they promise
Ordered a simple well as a gift for my brother's wedding. The team answered all my emails quickly and the project was finished in under three months. Excellent value.
Thank you to the whole team
Our family funded a well in the name of our late uncle. Seeing the community gather around it in the video was deeply emotional. Reliable and kind people.
Fast and transparent
I appreciated the clear pricing and the regular updates. The GPS coordinates let me see the exact village on the map. Proof of work was delivered with photos and a video.
Beautiful photos and videos
The quality of the follow-up is impressive. I received a personalised certificate, photos of the sign and a video of the first water. I recommend them to everyone around me.
Easy process, real impact
Simple to order, easy to personalise the sign, and the well was built on time. The team is responsive and answers every question. Highly recommended for sadaqah jariyah.
My first well, not my last
A friend recommended Well & Trees and I understand why. Professional, responsive and the proof of completion is very complete. Thank you for making this possible.
Reliable and efficient
I ordered on behalf of my parents and received everything within the timeline: photos, video, coordinates. The villagers' thank-you message was a lovely touch.
Highly recommended
Very satisfied with the result and the respect of the deadlines. The team even corrected a spelling mistake on the sign before production. Thank you!
Trustworthy team
Great communication throughout. The well looks solid and the sign is beautiful. I will be ordering trees next for my daughter's birth.
A gift that keeps giving
Ordered for Ramadan and received the completed well before Eid. The video of the children drinking clean water was worth every penny.
Reviews are collected from Well & Trees customers after a completed order.